SELECTED PROJECTS

Infrastructure challenges in practice.

Each project begins with a distinct energy, grid, water or industrial requirement. LTI combines the assets, stakeholders and contractual structures needed to address that requirement as an integrated infrastructure system.

Explore selected projects

ONE METHOD · DIFFERENT PRIORITIES

The architecture follows the project.

There is no standard equipment package behind LTI’s developments. System architecture is shaped by resource conditions, grid strength, hydrology, demand, land and water rights, permitting, local participation, finance and the operating requirements of each project country.

The projects below illustrate how the same engineering discipline can be applied to materially different infrastructure challenges.

01 · Zambia · Development

Kariba North

Floating Solar · BESS · Hydropower · 330 kV Grid

A utility-scale floating-solar and battery-storage development conceived to coordinate daytime renewable generation with hydropower dispatch, strategic water reserves and high-voltage transmission on Lake Kariba.

02 · Zimbabwe · Development

Kariba South

Floating Solar · BESS · Mining Demand · Water Resilience

An integrated renewable-infrastructure concept connecting floating solar and storage with dispatchable hydropower, industrial demand and the wider water–energy priorities of the Kariba system.

03 · Rwanda · Development

Rwabusoro

Floating Solar · Distributed BESS · Grid Integration

A floating-solar and distributed-storage platform adapted to semi-flooded land, productive electricity demand, network requirements and Rwanda’s long-term economic-development objectives.

04 · Kyrgyz Republic · Development

Toktogul

Floating Solar · Hydropower Coordination · Transmission

A two-phase floating-solar development on Lake Toktogul designed around large-scale renewable generation, hydropower coordination and internationally structured project finance.

05 · South Africa · Development

Grid-Support BESS

Battery Storage · Peak Management · Municipal Resilience

Battery-storage concepts structured around municipal and industrial network requirements, peak management, resilience, grid-support services and bankable long-term operation.

06 · Germany · Engineering & Delivery Preparation

Utility-Scale BESS

Battery Storage · Grid Connection · Lifecycle Performance

German battery-storage projects engineered around grid connection, control architecture, performance guarantees, degradation, testing, availability and lifecycle support.

All project descriptions, capacities and configurations are indicative and subject to ongoing studies, permitting, stakeholder approvals, contracting, financing and investment decisions. Inclusion does not represent notice to proceed, financial close, construction or commissioning.

DEVELOP A COMPLETE INVESTMENT CASE

Bring us the infrastructure challenge.

LTI works with governments, utilities, industrial users, investors and technology partners from initial concept through bankability and delivery preparation.

Discuss a project